The bedrooms, the LR and the dining rooms are painted. The floors look about the best they probably have since…I don’t know, the 60s?
All the tiles are pulled from the porch.
The kitchen and the breakfast nook are gutted. All paneling out, floor tiles out, cabinets taken down(thanks Cullen!).
I gutted one of the upstairs bedrooms. Its down to the beams and the rafters.
My garage is stacked with contractor bags.
We’re moving in day after tomorrow.
I’m very tired. Thats all I got right now.
Post a Comment